Movement & Path finding

I would really like this.

I am wondering if I am conflating two things here. (I always like to check my thinking as it is easy to lose a train of thought).

1 - Sequence detection timings [after mount_Tool() to verification via an IF statement]
2 - Web interface detection timings [after mount_tool() to web update]

Let me run some closer tests and I will report back as it is possible I have co-joined the two issues and drawn incorrect conclusions. I am also wondering if my unreliable UTM connection for the watering head (my favorite tool head) ‘might’ be in the mix here somehow. I know I am seeing something that should not be - just not exactly sure what.

Thread continues here

1 Like